Android Apps

Vasta
hexman
Õpetaja
Postitusi: 573
Liitunud: 10:22, 21 Juul 2003

Android Apps

Postitus Postitas hexman »

Tere!

Siia alla võiks siis edaspidi koondada kõik android appid, mis ühel või teisel moel sat-tvga on seotud.

dreamDroid 1.0 beta 26
sobib alates android 4.0

Requirements: 4.0+
Overview: This application enhances your Enigma2 receiver. Displays a TV and radio guide with full prime time support. Browse through your EPG and search for your favorite tv and radio shows. Stream channels and movies to your device. Edit timers and replace your remote control.
Image
Features:
★ Unlimited connection profiles (number of dreambox you can control using dreamDroid)
★ See what's currently running
★ Browse channels and their EPG
★ Manage timers and set them using the EPG or create new timers manually
★ Search the EPG
★ Browse recorded movies
★ Use the built-in Signal Meter with accoustic feedback to adjust your Dish or check your receiption quality
★ Send Messages
★ Use one of two Virtual Remote Controls (Simple and Full)
★ Make a Screenshot and save it
★ Set a shutdown timer
★ EXPERIMENTAL: Stream your favorite channel or recording using VLC for android or other available players
★ Choose between a dark (default) and a light theme.


If you have any questions or issues, please write me an email (german or english).


Try VLC Player, MX Player or vPlayer from Android Market for streaming.

Make sure you have excellent WLAN receiption and the latest Firmware on your Dreambox for a more stable streaming experience.


Please refrain from taking the streaming functionality as a major criterion for the app-rating. Because of the absence of capable videoplayers I do simply have NO INFLUENCE on stability and/or quality of streaming! Everything that dreamDroid can do has been implemented properly, all remaining issues are >99% player-releated.


You'd like to translate dreamDroid to your language?
Visit http://www.e2devel.com/translate/dreamDroid/

dreambox, enigma2

Recent changes:
1.0 beta 26★ FIX: Crash in "Current" when picons are enabled and box is in standby
★ UPDATE: German translation

1.0 beta 26
★ FIX: Configured picon path was ignored
★ FIX: Search issues on android >= 3.0
★ FIX: Picons with for renamed services didn't work
★ TECH: Replace "ActionBarSherlock" with Googles recently released "ActionBarCompat". Nothing should've really changed for Users, though
★ dreamDroid is now again compatible with API 7+ (Android >=2.1)

This app has NO advertisement

More Info:
Code:
https://play.google.com/store/apps/deta ... dreamdroid
Manused
dreamDroid_1.0_beta_26_.rar
dramdroid 1.0 beta 26
(4.4 MiB) Allalaaditud 747 korda
Kasutaja avatar
rootsikunn
Digivanake
Postitusi: 1389
Liitunud: 03:00, 01 Jaan 1970

Re: Android Apps

Postitus Postitas rootsikunn »

Kasutaja avatar
muhlui
Entusiast
Postitusi: 186
Liitunud: 15:58, 04 Juun 2003
Asukoht: Saaremaa

Re: Android Apps

Postitus Postitas muhlui »

Enigma Signal meter
https://play.google.com/store/apps/deta ... ignalmeter

Väga mugav ,sisevõrgu wifis, katusel natuke panni timmida.
Hea on allolev Request time :
sest siis on näha kui hea ühendus on tuuneriga

Pilt Pilt Pilt Pilt

Kirjeldus
Use your phone or tablet to align your satellite dish by reading signal levels from Enigma 1 or Enigma2 satellite receiver.
YOU WILL NEED SATELLITE RECEIVER WITH ENIGMA 1 OR ENIGMA 2 SOFTWARE TO USE THIS SOFTWARE.
SUPPORTS ALL currently existing Enigma1 and Enigma2 receivers and images, has same interface for both versions and works remotely (just forward web port and you can connect from anywhere). Additionally it allows you to ZAP channels, take screenshots and watch live TV streams directly on your device. SatFinder for Dreambox, VU+ and many others.

FOR STREAM:
- make sure you have video player with RTSP stream support (VPlayer or Daroon player)
- user internal IP address (192.168...) instead of public IP/hostname to avoid problems with routing and port forwarding. Once you're sure it's working locally and you have UPLOAD speed of more than 5-6 MBit/s try to forward TCP ports 80, 8001 and 31339.
Tested and working on this receivers:
- Dreambox DM500
- Dreambox DM500HD
- Dreambox DM600
- Dreambox DM7000
- Dreambox DM7020
- Dreambox DM7025
- Dreambox DM800
- Dreambox DM800SE
- Dreambox DM8000
- VU+ Uno
- VU+ Duo
- AzBox Premium
- AzBox HD Elite
- AzBox Ultra HD
- Kathrein UFS 910
- IPBox 9000
- Amiko Alien
- Topfield TF 7700HD PVR
- Gigablue solo
- ClarkeTech ET9000
- ClarkeTech Xtrend ET5000
For informations and support visit
http://www.krkadoni.com
VU+UNO, OpenPLi 3.0, 0.8W 4.8E 13E 19.2E 23.5E 36E, NOVA-T MUX1
kuutamo
Uudistaja
Postitusi: 24
Liitunud: 09:21, 30 Okt 2012

Re: Android Apps

Postitus Postitas kuutamo »

Kas keegi viitsib seletada kuidas saaks selle välisvõrgus tööle.
Kasutaja avatar
valgekotkas
Admin
Postitusi: 3362
Liitunud: 03:00, 01 Jaan 1970
Asukoht: põhjalätilähedal

Re: Android Apps

Postitus Postitas valgekotkas »

väga lühike vastus on selline: vajalik avalik IP ja VPN võimeline ruuter ja mõningad portide suunamised :wink: ... ilma VPN-ita laiale maailmale oma koduvõrgu tutvustamine ilma tulemüürita on tänapäeval suhteliselt pornograafiline tegevus :lol:
"Microsoft sells you Windows ... Linux gives you the whole house."
hexman
Õpetaja
Postitusi: 573
Liitunud: 10:22, 21 Juul 2003

Re: Android Apps

Postitus Postitas hexman »

Tere!

Pole just otseselt seotud satiga, kuid fännile väike abimees alati käepärast.

Terv
Hex

ElectroDroid is a simple and powerful collection of electronics tools and reference;

Features:
• Resistor color code decoder (3-6 bands, with inverse look-up);
• SMD Resistor Code;
• Inductor color code decoder;
• Ohm’s law calculator;
• Reactance/Resonance calculator;
• Voltage divider;
• Resistors ratio, value/series/parallel;
• Capacitor charge calculation;
• Operational amplifier;
• LED resistor calculator (with customizable database);
• Adjustable voltage regulator/LM317 calculator (with customizable values);
• Heat dissipation;
• Battery Life calculator;
• Inductor design tool;
• Voltage Drop calculator;
• PCB Trace Width calculator;
• Simple Filters calculator;
• NE555 calculator;
• Power Calculator;
• RMS Converter;
• Decibel Converter;
• Frequency Converter;
• Analog-Digital Converter;
• Port pin-out (USB, Serial, Parallel, Ethernet, RJ, SCART, DVI, HDMI, S-Video, VGA, VESA, Display Port, FireWire, Jack, RCA, XLR/DMX, ATX Power, PC Molex, EIDE, SATA, PS/2-AT, MIDI/Game port, Apple 30-pin, PDMI, OBD-II, 25-pair phone cable color code, Color Code for Fiber Optic Cables, SD card, Raspberry Pi, LCD, GPIB/IEEE-488);
• Resources (Resistivity table; Table of standard resistors and capacitors; Capacitor marking codes; AWG and SWG Wire size; Ampacity Table; Symbols and Abbreviations; Circuit Schematic Symbols; SI Units prefixes; Battery info; Boolean logic gate and algebra Theorems; 7400 info and pinout; ASCII codes, Batteries list, 78xx IC, ChipDB IC pinouts, Switch Information, Decibel Table, PIC ICSP/AVR ISP, SMD Package Size, Radio frequencies, PT100 Conversion Table, Fuses and Automotive Fuses color code);
• Full support for EIA resistor series for all calculators;
...and more to come!

What's New:
• Y-Δ Transformation;
• Range Converter [Pro];
• faster insertion of values in the popup dialog;
• standard resistors info in resistor color code;
• possibility to choose the resistor's serie in voltage divider and 555 calculators;
• ISO connector for car audio;
• Arduino Uno pin-outs;
• Arduino Due, Leo, Mega, Micro pin-outs [Pro];
• Thermocouples color codes [Pro];
• bug fix in LM317 calculator;
• Fixed some resources/pinouts;
• bugs fix;
• updated translations, added languages;
Manused
ElectroDroid Pro v3.4.3.rar
(2.48 MiB) Allalaaditud 1862 korda
Kasutaja avatar
rootsikunn
Digivanake
Postitusi: 1389
Liitunud: 03:00, 01 Jaan 1970

Re: Android Apps

Postitus Postitas rootsikunn »

Kasutaja avatar
dreamants
Digivanake
Postitusi: 1118
Liitunud: 03:00, 01 Jaan 1970
Asukoht: Õlletehase lähistel

Re: Android Apps

Postitus Postitas dreamants »

muhlui kirjutas:Enigma Signal meter
https://play.google.com/store/apps/deta ... ignalmeter

Väga mugav ,sisevõrgu wifis, katusel natuke panni timmida.
Hea on allolev Request time :
sest siis on näha kui hea ühendus on tuuneriga

Pilt Pilt Pilt Pilt

Kirjeldus
Use your phone or tablet to align your satellite dish by reading signal levels from Enigma 1 or Enigma2 satellite receiver.
YOU WILL NEED SATELLITE RECEIVER WITH ENIGMA 1 OR ENIGMA 2 SOFTWARE TO USE THIS SOFTWARE.
SUPPORTS ALL currently existing Enigma1 and Enigma2 receivers and images, has same interface for both versions and works remotely (just forward web port and you can connect from anywhere). Additionally it allows you to ZAP channels, take screenshots and watch live TV streams directly on your device. SatFinder for Dreambox, VU+ and many others.

FOR STREAM:
- make sure you have video player with RTSP stream support (VPlayer or Daroon player)
- user internal IP address (192.168...) instead of public IP/hostname to avoid problems with routing and port forwarding. Once you're sure it's working locally and you have UPLOAD speed of more than 5-6 MBit/s try to forward TCP ports 80, 8001 and 31339.
Tested and working on this receivers:
- Dreambox DM500
- Dreambox DM500HD
- Dreambox DM600
- Dreambox DM7000
- Dreambox DM7020
- Dreambox DM7025
- Dreambox DM800
- Dreambox DM800SE
- Dreambox DM8000
- VU+ Uno
- VU+ Duo
- AzBox Premium
- AzBox HD Elite
- AzBox Ultra HD
- Kathrein UFS 910
- IPBox 9000
- Amiko Alien
- Topfield TF 7700HD PVR
- Gigablue solo
- ClarkeTech ET9000
- ClarkeTech Xtrend ET5000
For informations and support visit
http://www.krkadoni.com
Sellega on tõesti hea päid paika ajada. Kui endale T90 muretsesin olin hirmul kui siit kusagilt lugesin, et kui suur jama on seda paika häälestada. Üllatus oli suur kui avastasin, et selle äppiga see värk üsna lihtne on.
Kasutaja avatar
aims
Edasijõudnu
Postitusi: 36
Liitunud: 09:38, 08 Mai 2010
Asukoht: Järveküla, Rae vald

Re: Android Apps

Postitus Postitas aims »

Kasutan enda T90 juures ka sama äppi, väga mugav tõesti katusel panni juures toimetada.
Kasutaja avatar
kokku123
Digivanake
Postitusi: 1730
Liitunud: 03:00, 12 Juul 2006
Asukoht: Euroopa

Re: Android Apps

Postitus Postitas kokku123 »

Samuti selle äpi abil paika pannud.
Ainukeseks miinuseks, et minu tüüneriga ei kuva BERi :roll:
Kasutaja avatar
dreamants
Digivanake
Postitusi: 1118
Liitunud: 03:00, 01 Jaan 1970
Asukoht: Õlletehase lähistel

Re: Android Apps

Postitus Postitas dreamants »

Mul küsimus DreamDroidi kohta. Nimelt, kui klikin 'Filmid', siis ei loe salvestuste nimekirja sisse. Kas on kusagil seadistustes viga või on midagi muud mille peale ma ei tule?
Kasutaja avatar
faas
Moderaator
Postitusi: 4351
Liitunud: 03:00, 01 Jaan 1970
Asukoht: Jõelähtme.Rebala

Re: Android Apps

Postitus Postitas faas »

Siin OK


edit.
minul on media/hdd/movie dreamis välja jagatud, mingit muud kemüüset pole teinud ja jookseb default seadetes. :)
Manused
Screenshot_2014-11-04-21-35-06.png
DM8000, DM7020, VU+ Ultimo4K Toroidal T90 5W;4W;0.8W;4.8E;9E;10E;13E;16E;19E;23.5E;36E+1,1M 28,2E, LG OLED55E6V
Kasutaja avatar
valzz
Entusiast
Postitusi: 141
Liitunud: 15:13, 30 Jaan 2008
Asukoht: Tallinn

Re: Android Apps

Postitus Postitas valzz »

Vasta

Mine “Tarkvara”